Hear two practical case studies from the field. Aker BP shares how a 15-meter stuck BHA was recovered using coiled tubing on a platform with very limited deck space, and Stavanger Engineering presents a new lubricator securing bridge built to make rig up and skidding safer and more efficient.

CT-Conveyed Retrieval of a Stuck BHA with Slickline -Presented by Lars Victor Hoff Risvold, Senior Intervention Engineer, Aker BP
The operation retrieved a 15-meter-long stuck BHA with approximately 270 meters of slickline still attached. Coiled Tubing was required to perform the job, and the challenge was rigging up CT on verylimited deck space (NUI).
Pioneering Safety and Efficiency with the LubricatorSecuring Bridge – Tomas Johnsen, Managing Director and Owner, Stavanger Engineering and Lasse Nordhus, Sales & Commercial Manager, Wireline Norway & Europe, Archer
This groundbreaking system is a major step forward in offshore safety and operational efficiency. It supports both rig up and skidding to a new well while providing a safer working environment. The lubricator securing bridge is the result of a collaboration between Archer,Equinor and Stavanger Engineering.
Bookings will open soon! Non-member tickets include ICoTA membership through to the end of 2027.
For more information, email admin@icota-europe.com
Our distinguished speakers bring a wealth of knowledge and experience to the event, offering unique insights into the industry's latest trends and innovations.
Explore available ticket options to ensure you don't miss out on this exceptional event, brought to you by ICoTA Europe.